Quarterly Technical Status Report
DYNAMO: Dynamic Assembly from Models

Agreement/Contract Number: [F30602-00-2-0618]

For the period of: [01 Jul 2002 - 30 Sep 2002]

Spencer Rugaber Principle Investigator
Georgia Institute of Technology
Atlanta, Georgia 30332-0280
E-mail: spencer@cc.gatech.edu
Voice: 404.894.8450
FAX: 404.894.9442

WWW Homepage: http://www/cc/gatech.edu/dynamo

1.0 Participants

Faculty:

2.0 Ongoing Research & Development

  • The major activity at the start of the period was the Baltimore demos. At Baltimore, the DYNAMO project demonstrated its compilation technology. In particular, it demonstrated COGITO, a compiler which takes as input an an XMI encoding of an ARGO-UML specification including a UML class model diagram annotated with OCL constraints. COGITO generates C++ wrapper code that enforces the guarantees specified by the OCL constraints. The wrappers are designed in such a way as to not add any additional overhead to system performance.
  • An XSLT version of ParaGen has been constructed to replace the C version. ParaGen converts XMI representations of DYNAMO UML static models into Para, the intermediate representation used by the DYNAMO tools.
  • Work on invariant maintenance, previously concentrated on mode components, has been generalized in such a way that a designer can choose how to package a set of components. Choices include wrappers, mediators, or distributed responsibility.
  • 3.0 Notable Accomplishments, Breakthroughs & Technology Transition

    4.0 Collaboration Activities

    5.0 Publications and Presentations

    6.0 Travel

    7.0 Funding Summary

  • Funding received as of 2002.9.30: $325,000.00
  • Funding expenditures and open commitments as of 2002.9.30: $190,606.66
  • An encumbrance exists for an additional $82,570.02, to pay the Michigan State subcontract.
  • 8.0 Overall Project Status: green

    Dr. Rugaber has returned to Georgia Tech from his IPA assignment at NSF. He has resumed his role as Technical Point of Contact and PI, which had been filled by Mike McCracken in his absense.

    9.0 Plans For The Next Reporting Period