Quarterly Technical Status Report
DYNAMO: Dynamic Assembly from Models

Agreement/Contract Number: [F30602-00-2-0618]

For the period of: [01 Oct 2002 - 31 Dec 2002]

Spencer Rugaber Principle Investigator
Georgia Institute of Technology
Atlanta, Georgia 30332-0280
E-mail: spencer@cc.gatech.edu
Voice: 404.894.8450
FAX: 404.894.9442

WWW Homepage: http://www/cc/gatech.edu/dynamo

1.0 Participants

Faculty:

2.0 Ongoing Research & Development

  • Work on invariant maintenance, previously concentrated on mode components, has been generalized in such a way that a designer can choose how to package a set of components. Choices include wrappers, mediators, or distributed responsibility.
  • An example has been developed of applying the DYNAMO approach to the synchronization of files in file systems on distributed computers
  • 3.0 Notable Accomplishments, Breakthroughs & Technology Transition

    4.0 Collaboration Activities

    5.0 Publications and Presentations

    P. K. McKinley, R. E. K. Stirewalt, B. H. C. Cheng, L. K. Dillon, and S. Kulkarni.
    "Interactive distributed applications and the computer science curriculum."
    IEEE Distributed Systems Online, 3(10), October, 2002.

    Z. Yang, B. H. C. Cheng, R. E. K. Stirewalt, J. Sowell, M. Sadjadi, and P. K. McKinley.
    "An aspect-oriented approach to dynamic adaptation."
    Proceedings of WOSS'02.

    L. A. Campbell, B. H. C. Cheng, W. E. McUmber, and R. E. K. Stirewalt.
    "Automatically detecting and visualizing errors in UML diagrams."
    Requirements Engineering Journal, 7(4):264-287 December 2002.

    6.0 Travel

    7.0 Funding Summary

  • Funding received as of 2002.12.31: $325,000.00
  • Funding expenditures and open commitments as of 2002.12.31: $$187,241.31
  • Funding Encumbrances as of 2002.12.31: $ 70,962.72.
  • Note: the College of Computing Financial Services Office has informed there was a mistake in last quarter's funding expenditures. A student was included from a different project. Thus, last  quarter's reported figure should be less than it was.
  • 8.0 Overall Project Status: green

    9.0 Plans For The Next Reporting Period